Risk Breakdown Structure

As a project unfolds, the project management team and or the project management team leader will find themselves in positions in which they realize that a particular component as to the project and or a particular facet of that project does in fact come with a set or series of inherent risk. When attempting to organize any and all risks for the purposes of attempting to determine what the best strategy in dealing with them may be, it is often helpful to utilize this tool that is known as the risk breakdown structure. The risk breakdown structure is specifically a tool that represents an organized description of any known project risks that are arranged by a number of categories and characteristics. This risk breakdown structure will display all of the risks as well as some of their possible causes. This tool, when utilized by the project management team and or the project management team leader, is often broken down and tailored by project type.

This term is defined in the 3rd and the 4th edition of the PMBOK.

Quality Management and Control Tools

Project management requires different types of quality planning tools. The Quality Management and Control tools refer to the tools that are used to sequence as well as provide links to the activities identified during project management planning. There are basically seven types of Quality Management and Control tools used as follows:

  • Affinity diagrams: This is similar to mind-mapping that is used to generate ideas that can be linked to create organized patterns of thoughts regarding a particular problem.
  • Process decision program charts: This tool is used to understand goals with respect to the steps on achieving them. It is a great method for contingency planning.
  • Interrelationship diagraphs: It refers to creating relationship of different ideas and scenarios to solve problems.
  • Tree diagrams: It is used to decompose hierarchies like the risk breakdown structure and work breakdown structure. It is also used in visualizing the relationship or hierarchies.
  • Prioritization matrices: This tool helps identify key issues for implementation. It is also used in determining suitable alternatives.
  • Activity network diagram: Also called the arrow diagram, it is used in projecting the scheduling methodologies.
  • Matrix diagrams: It is used to perform data analysis within a matrix to show the strength of the relationship between factors.

This term is defined in the 5th edition of the PMBOK.

Acronyms and Abbreviations

The following list includes all common acronyms and abbreviations that are used in the world of project management. Terms are linked to definitions where available. Please let me know if you miss an abbreviation or an acronym! I will also extend this list from time to time. However, this list is supposed to include only “pure” project management terms and not industry-specific ones (although I might include some of the software world).

Please note that some of the acronyms might have a different meaning in other contexts so you should take them with a grain of salt if you are not sure about the context. You may want to consult Wikipedia for other meanings.

AC Actual Cost
ACWP Actual Cost of Work Performed
AD Activity Description
ADM Arrow Diagramming Method
AE Apportioned Effort
AF Actual Finish date
AOA Activity – On – Arrow
AON Activity – On – Node
AS Actual Start date
BAC Budget At Completion
BCWP Budgeted Cost of Work Performed
BCWS Budgeted Cost of Work Scheduled
BOM Bill Of Materials
CA Control Account
CAP Control Account Plan
CCB Change Control Board
COQ Cost Of Quality
CPAF Cost plus award fee
CPF Cost-Plus-Fee
CPFF Cost-Plus-Fixed-Fee
CPI Cost Performance Index
CPIF Cost-Plus-Incentive-Fee
CPM Critical Path Method
CPPC Cost-Plus-Percentage of Cost
CV Cost Variance
CWBS Contract Work Breakdown Structure
DD Data Date
DU Duration
DUR Duration
EAC Estimate at Completion
EF Early Finish Date
EMV Expected Monetary Value
ES Early Start Date
ETC Estimate to Complete
EV Earned Value
EVM Earned Valued Management
EVT Earned Valued Technique
FF Finish-to-Finish
FF Free Float
FFP Firm-Fixed-Price
FMEA Failure Mode and Effect Analysis
FPIF Fixed-Price-Incentive-Fee
FS Finish-to-Start
IFB Invitation for Bid
KPI Key Performance Indicator
LF Late Finish date
LOE Level of Effort
LS Late Start date
OBS Organizational Breakdown Structure
OD Original Duration
PC Percent Complete
PCT Percent Complete
PDM Precedence Diagramming Method
PF Planned Finish date
PM Project Management
PM Project Manager
PMBOK Project Management Body Of Knowledge
PMIS Project Management Information System
PMO Program Management Office
PMO Project Management Office
PMP Project Management Professional
PS Planned Start Date
PSWBS Project Summary Work Breakdown Structure
PV Planned Value
QA Quality Assurance
QC Quality Control
QFD Quality Function Deployment
RAM Responsibility Assignment Matrix
RBS Resource Breakdown Structure
RBS Risk Breakdown Structure
RD Remaining Duration
RFP Request for Proposal
RFQ Request for Quotation
SF Scheduled Finish date
SF Start-to-Finish
SOW Statement of Work
SPI Scheduled Performance Index
SS Scheduled Start date
SS Start-to-Start
SV Schedule Variance
SWAG Sophisticated Wild Ass Guess
SWOT Strenths, Weaknees, Oppurtunities, and Threads
TC Target Completion date
TF Target Finish date
TF Total Float
T&M Time and Material
TQM Total Quality Management
TS Target Start date
VE Value Engineering
WBS Work Breakdown Structure

Definitions

This project management glossary has been created with diligence, but there is no guarantee that all definitions are accurate. Some of the terms do not appear in the current version of the PMBOK but are listed here in order to provide information about terms that might still be used.

Also, please note that copying this material is forbidden since the copyright is restricted. You are allowed to quote parts of a definition, provided that you refer to this site with a working backlink AND you don’t quote more than 25 words from one definition in one document.

A

Accept | Acceptance | Acceptance Criteria | Accepted Deliverables | Accuracy | Acquire Project Team | Acquire Resources | Acquisition | Activity | Activity Attributes | Activity Code | Activity Cost Estimates | Activity Definition | Activity Description | Activity Duration | Activity Duration Estimating | Activity Identifier | Activity List (Activity Network Diagrams) | Activity Resource Estimating [Process] | Activity Resource Requirements | Activity Sequencing [Process] | Activity-on-Arrow (AOA) | Activity-on-Node | Actual Cost | Actual Cost of Work Performed (ACWP) | Actual Duration | Actual Finish Date (AF) | Actual Start Date (AS) | Adaptive Life Cycle | Additional Quality Planning Tools | Adjusting Leads and Lags | Advertising | Affinity Diagram | Agreement | Alternative Analysis | Alternatives Generation | Analogous Estimating [Technique] | Analytical Techniques | Application Area | Applying Leads and Lags | Apportioned Effort (AE) | Approval | Approve | Approved Change Request [Output/input] | Approved Change Requests Review | Arrow | Arrow Diagramming Method (ADM) [Technique] | As-of Date | Assumptions [Output/Input] | Assumptions Analysis [Technique] | Assumptions Log | Attribute Sampling | Authority

B

Backlog | Backward Pass | Bar Chart [Tool] | Baseline | Baseline Finish Date | Baseline Start Date | Basis of Estimates | Benchmarking | Benefits Management Plan | Bidder Conference | Bid Documents | Bill of materials (BOM) | Bottom-up Estimating [Technique] | Brainstorming [Technique] | Budget | Budget at Completion | Budgeted Cost of Work Performed | Budgeted Cost of Work Scheduled | Buffer | Business Case | Business Value | Buyer

C

Calendar Unit | Cause and Effect Diagram | Central Tendency | Change Control | Change Control Board (CCB) | Change Control System [Tool] | Change Control Tools | Change Log | Change Management Plan | Change Request | Chart of Accounts | Charter | Checklist | Checklist Analysis | Checksheets | Claim | Claims Administration | Close Procurements | Close Project | Close Project or Phase | Closed Procurements | Closing Process Group | Closing Process | Co-location | Code of Accounts (in Project Management) | Collect Requirements | Colocation | Common Cause | Communication (in project management) | Communication Constraints | Communication Management Plan | Communication Methods | Communication Models | Communication Requirements Analysis | Communication Technology | Communications Management Plan | Communications Planning | Compensation | Compliance | Component | Conduct Procurements | Configuration Management System | Conflict Management | Conformance | Conformance Work | Constraint | Context Diagrams | Contingency | Contingency Allowance | Contingency Reserve | Contingent Reserve Strategies | Contract | Contract Change Control System | Contract Administration | Contract Closure | Contract Management Plan | Contract Statement of Work | Contract Work Breakdown Structure | Control | Control Account | Control Account Plan | Control Chart | Control Communications | Control Costs | Control Limits | Control Procurements | Control Quality | Control Resources  | Control Risks | Control Schedule | Control Scope | Control Stakeholder Engagement | Controlling | Corrective Action | Cost | Cost Aggregation | Cost Baseline | Cost Budgeting | Cost Control | Cost Estimating | Cost Management Plan | Cost of Quality (COQ) | Cost Performance Index | Cost Variance (CV) | Cost-Plus-Fee | Cost Plus Award Fee Contract (CPAF) | Cost-Plus-Fixed-Fee (CPFF) Contract | Cost Plus Incentive Fee (CPIF) Contract | Cost-Plus-Percentage of Cost (CPPC) | Cost-Reimbursable Contract | Cost-Benefit-Analysis | Crashing | Create Work Breakdown Structure (WBS) | Criteria | Critical Activity | Critical Chain Method | Critical Path | Critical Path Activity | Critical Path Method (CPM) | Current Finish Date | Current Start Date | Customer | Customer Satisfaction

D

Data Date (DD) | Date | Data Gathering and Representation Techniques | Decision Making techniques | Decision Tree Analysis | Decomposition | Defect | Defect Repair | Define Activities | Define Scope | Deliverable | Delphi Technique | Dependency | Dependency Determination | Design of Experiments | Design Review | Determine Budget | Develop Project Charter | Develop Project Management Plan | Develop Project Scope Statement (preliminary) | Develop Project Team | Develop Schedule | Develop Team | Diagramming Techniques | Dictatorship | Direct and Manage Project Work | Direct and Manage Project Execution | Discipline | Discrete Effort | Discretionary Dependency | Document | Document Analysis | Documentation Reviews | Documented Procedure | Dummy Activity | Duration

E

Early Finish Date | Early Start Date | Earned Value | Earned Value Management | Earned Value Technique | Effort | Emotional Intellligence | Enterprise | Enterprise Environmental Factors | Estimate | Estimate Activity Durations | Estimate Activity Resources | Estimate at Completion | Estimate Costs | Estimate to Complete | Event | Exception Report | Execute | Executing | Executing Process | Executing Process Group | Execution | Expected Monetary Value Analysis | Expert Judgment | Explicit Knowledge | External Dependency

F

Facilitated Workshops | Failure Mode and Effect Analysis | Fallback Plan | Fast Tracking | Fee | Finish Date | Finish-to-Finish | Finish-to-Start | Firm-Fixed-Price Contract | Fishbone Diagram | Fixed Formula Method | Fixed-Price-Incentive-Fee Contract |
Fixed Price with Economic Price Adjustment Contract (FP-EPA) | Fixed-Price Contract | Fixed-Price or Lump Sum Contract |
Float | Flowchart | Flowcharting | Focus Groups | Forecasts | Forward Pass | Free Float | Functional Manager | Functional Organization | Funding Limit Reconciliation | Funds

G

Gantt Chart | Goods | Grade | Ground Rules | Group Creativity Techniques | Group Decision Making Techniques | Guideline

H

Hammock Activity | Hard Logic | Histogram | Historical Information | Human Resource Management Plan | Human Resource Planning

I

Idea/Mind Mapping | Identify Risks | Identify Stakeholders | Implement Risk Response | Imposed Date | Incentive Fee | Incremental Life Cycle | Influence Diagram | Independent Estimates | Influencer | Information Distribution | Information Gathering Techniques | Information Management Systems | Initiating Process | Initiator | Input | Inspection | Inspections and Audits | Integral | Integrated | Integrated Change Control | Interpersonal Skills | Interrelationship Digraphs | Interviews | Invitation for Bid | Issue | Issue Log | Iterative Life Cycle

K

Knowledge | Knowledge Area Process | Knowledge Area, Project Management

L

Lag | Late Finish Date | Late Start Date | Latest Revised Estimate | Lead (Technique) | Lessons Learned | Lessons Learned Knowledge Base | Level of Effort (LOE) | Leveling | Life cycle | Log | Logic | Logic Diagram | Logical Relationship

M

Majority | Make-or-Buy Analysis | Make-or-Buy Decisions | Manage Communications Project Team | Manage Stakeholders | Manage Stakeholder Engagement | Management Reserve | Management Skills | Mandatory Dependency | Market Research | Master Schedule | Material | Materiel | Matrix Diagrams | Matrix Organization | Methodology | Milestone | Milestone List | Milestone schedule | Monitor | Monitor and Control Project Work | Monitoring | Monitoring and Controlling Processes | Monte Carlo Simulation | Monte Carlo Analysis | Most Likely Duration

N

Near-Critical Activity | Negotiation | Network | Network Analysis | Network Logic | Network Loop | Network Open End | Network Path | Networking [Technique] | Node | Nominal Group Technique | Nonconformance Work

O

Objective | Observations | Operations | Opportunity | Optimistic Duration | Organization | Organization Chart [Tool] | Organizational Breakdown Structure (OBS) | Organizational Process Assets | Organizational Project Management Maturity | Original Duration (OD) | Output

P

Parametric Estimating | Pareto Chart | Path Convergence | Path Divergence | Payment Systems | Percent Complete (PC or PCT) | Perform Integrated Change Control | Perform Qualitative Risk Analysis | Perform Quality Assurance (QA) | Perform Quantitative Risk Analysis | Perform Quality Control (QC) | Performance Maintenance Baseline | Performance Reporting | Performance Reports | Performance Reviews | Performing Organization | Phase | Phase Gate | Plan Communications Management | Plan Contracting | Plan Cost Management | Plan Human Resource Management | Plan Procurment Management | Plan Purchases and Acquisitions | Plan Quality Management | Plan Risk Management | Plan Risk Responses | Plan Schedule Management | Plan Scope Management | Plan Stakeholder Management | Planned Finish Date | Planned Start Date | Planned Value | Planning Package | Planning Processes | Policy | Portfolio | Portfolio Management | Position Description | Practice | Precedence Diagramming Method | Precedence Relationship | Precision | Predecessor Activity | Predictive Life Cycle | (Preferential Logic) | (Preferred Logic) | Preventive Action | Prioritization Matrices | Probability and Impact Matrix | Procedure | Process | Process Analysis | Process Decision Program Charts (PDPC) | Process Group | Process Improvement Plan | Procurement Audits | Procurement Documents | Procurement Management Plan | Procurement Performance Reviews | Procurement Statement of Work | Product | Product Analysis | Product Life Cycle | Product Scope | Product Scope Description | Program | Program Evaluation and Review Technique | Program Management | Program Management Office | Progressive Elaboration | Project | Project-Based Organizations (PBOs) | Project Calendar | Project Charter | Project Communications Management | Project Cost Management | Project Funding Requirements | Project Governance | Project Human Resource Management | Project Initiation | Project Integration Management | Project Life Cycle | plan procurement management process |
Project Management Body of Knowledge (PMBOK) | Project Management Information System (PMIS) | Project Management Knowledge Area | Project Management Office | Project Management Plan | Project Management Process | Project Management Process Group | Project Management Professional | Project Management Software | Project Management Staff | Project Management System | Project Management Team | Project Manager | Project Organization Chart | Project Phase | Project Process Groups | Project Procurement Management | Project Quality Management | Project Risk Management | Project Schedule | Project Schedule Network Diagram | Project Scope | Project Scope Management | Project Scope Management Plan | Project Scope Statement | Project Sponsor | Project Stakeholder | Project Stakeholder Management | (Project Statement of Work) | Project Summary Breakdown Structure | Project Team | Project Team Dictionary | Project team members | Project Time Management | Project Work | Projectized Organization | Proposal Evaluation Techniques | Prototypes

Q

Qualitative Risk Analysis | Quality | Quality Audits | Quality Checklists | Quality Control Measurements | Quality Function Deployment (QFD) | Quality Management and Control Tools | Quality Management Plan | Quality Management System | Quality Metrics | Quality Planning | Quality Policy | Quality Requirement | Quantitative Risk Analysis and Modelling Techniques | Quantitative Risk Analysis | Questionnaires and Surveys

R

RACI | Records Management System | Regression Analysis | Reliability | Remaining Duration | Reporting Systems | Request for Information (RFI) | Request for Proposal (RFP) | Request for Quotation (RFQ) | Request Seller Responses | Requested Change | Requirement | Requirements Documentation | Requirements Management Plan | Requirements Traceability Matrix |
Reserve | Reserve Analysis | Residual Risk | Resource | Resource Breakdown Structure | Resource Calendar | Resource Histogram | Resource Leveling | Resource Optimization Techniques | Resource Planning | Resource Smoothing | Resource-constrained Schedule | Resource-Limited Schedule | Responsibility | Responsibility Assignment Matrix | Result | Retainage | Rework | Risk | Risk Acceptance | Risk Appetite | Risk Audit | Risk Avoidance | Risk Breakdown Structure | Risk category | Risk Categorization | Risk Database | Risk Data Quality Assessment | Risk identification | Risk management plan | Risk Management Planning | Risk Mitigation | Risk Monitoring and Control | Risk Reassessment | Risk Register | Risk Response Planning | Risk Threshold | Risk Tolerance | Risk Transference | Risk Urgency Assessment | Role | Rolling Wave Planning |
Root Cause Analysis

S

S-Curve | Scatter Diagram | Schedule | Schedule Activity | Schedule Analysis | Schedule Baseline | Schedule Compression | Schedule Control | Schedule Data | Schedule Development | Schedule Forecasts | Schedule Management Plan | Schedule Milestone | Schedule Model | Schedule Network Analysis | Schedule Network Templates | Schedule Performance Index (SPI) | Scheduled Finish Date (SF) | Scheduled Start Date (SS) | Scheduled Variance (SV) | Scheduling Tool | Scope | Scope Baseline | Scope Change | Scope Control | Scope Creep | Scope Definition | Scope Management Plan | Scope Planning | Scope Verification | Secondary Risk | Select Sellers | Selected Sellers | Seller | Seller Proposals | Sensitivity Analysis | Sequence Activities | Seven Basic Quality Tools | Service | Should-Cost Estimate | Simulation | Skill | Soft Logic | Source Selection Criteria | Special Cause | Specification | Specification Limits | Sponsor | Sponsoring Organization | Staffing Management Plan | Stakeholder | Stakeholder Analysis | Stakeholder Management Plan | Stakeholder Register | Standard | Start Date | Start-to-Finish (SF) | Start-to-Start | Statement of Work | Statistical Sampling | Strengths, Weaknesses, Opportunities and Threats (SWOT) Analysis | Subnetwork | Subphase | Subproject | Successor Activity | Summary Activity, Hammock Activity | SWAG | SWOT Analysis | System

T

Tailor | Target Completion Date | Target Finish Date | Target Schedule | Target Start Date (TS) | Team Members | Technical Performance Measurement | Technique | Template | Threat | Three-Point Estimates | Thresholds | Time & Material (T&M) Contract | Time-Scaled Schedule Network Diagram | To-Complete Performance Index | Tornado Diagram | Tool | Total Float | Total Quality Management (TQM) | Tree Diagram | Trend Analysis [Technique] | Trigger Condition | Triple Constraint

U

Unanimity | User | Validate Scope | Validation | Value Engineering | Variance | Variance Analysis | Variance at Completion (VAC) | Variation | Velocity | Verification | Verified Deliverables | Virtual Team | Voice of the Customer

W

War Room | Weighted Milestone Method | What-if Scenario Analysis | (WBS Dictionary) | Work | Work Authorization (Method) | Work Authorization System | Work Breakdown Structure | Work Breakdown Structure Component | Work Breakdown Structure Dictionary | Work Package | Work Performance Data | Work Performance Information | Work Performance Reports |
Workaround

All new terms of the PMBOK 5th edition

Tom · Jun 26, 2016 ·

It took a bit longer to go through this, but here they are, all the terms that have been added to the 5th edition of the Project Management Body of Knowledge, 5th edition. There are some interesting terms in it, terms that we would have thought were already part of the project management world but that had not been added officially. And who would have thought that Emotional Intelligence finally made it into the PMBOK? 238 new terms while some terms also had to leave our beloved PMBOK. Schedule Activity had to leave the PMBOK already in the 4th edition, but what has S-Curve done to the project world that it did not make it into the 5th edition? [Read more…] about All new terms of the PMBOK 5th edition

  • Page 1
  • Page 2
  • Go to Next Page »

Primary Sidebar

Articles

  • November 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • December 2022
  • August 2021
  • September 2020
  • October 2019
  • October 2018
  • April 2017
  • June 2016
  • April 2016
  • November 2015
  • April 2013
  • March 2013
  • May 2011
  • April 2011
  • March 2011
  • February 2011
  • January 2011
  • December 2010
  • November 2010
  • October 2010
  • September 2010
  • August 2010
  • July 2010
  • March 2010
  • January 2010
  • October 2009
  • August 2009
  • June 2009
  • April 2009
  • March 2009
  • February 2009
  • January 2009
  • December 2008
  • November 2008
  • October 2008
  • September 2008
  • August 2008
  • July 2008
  • June 2008
  • January 2008

Dear Visitor,

I am a certified project manager (PMP) - Please let me know if you have any questions about project management that are not explained on this site!

Best Regards,

Tom

Copyright © 2025

  • Privacy Policy